Construction observations and coordination between TxDOT and developer.
Doucet provided comprehensive civil engineering design and construction documents; specifically, water utility plan & profile, horizontal dimensioning and roadway design, grading plan and erosion and sedimentation control plan to allow for the relocation of approximately 900 LF of a 24 City of Austin-owned water line and additional turning lanes to enhance access and increase overall safety of the Rock Harbor Drive & FM 620 intersection. The design of the relocated water line was per City of Austin specifications, and as such, close communication and coordination with the City of Austin's Water Utility Department was needed. Permitting through the City of Austin was also required.