Doucet worked with the City of Sunset Valley to provide conceptual plans and design for the construction of an extended portion of Ernest Robles Way (ERW) between U.S. 290 and Jones Road. The project included excavation of substandard subgrade and base materials and reconstruction of curbs and gutters and repaving, plus installation of decorative medians for separating traffic, and creating unobstructed turning lanes for school bus traffic and commercial vehicles.
The project also included injection grouting and repair of failed pavement areas; improving turning radii at U.S. 290 and Jones Road intersections; construction of raised boulevard section toward each end of roadway; placement of a 2-inch hot mix asphalt overlay on ERW from Jones Road to Hwy. 290 and pavement markings on the entire length of ERW from Brodie to Hwy. 290. Doucet performed the design work including repair details and drainage improvements, prepared the construction plans and specifications and coordinated with the Public Works Department.