Educational

Austin Independent School District (AISD)

Doucet provided civil engineering and consulting services for multiple repair and improvement projects at 15 existing campuses for AISD, including more than 30 individual projects under 4 separate contracts. The projects included drainage and grading improvements, sidewalk additions and improvements, accessibility compliance, pavement repairs and restoration, tennis court resurfacing and recreation improvements. Doucet was responsible for visiting the school sites to identify limits and extent of the repair and improvement items, preparing bid documents including construction plans and specs for the improvements, assisting in the bidding process and providing construction phase services. Some of the campuses include but are not limited to:

Anderson High School

Barton Hills Elementary School

Becker Elementary School

Bedicheck Middle School

Boone Elementary School

Bowie High School

Cook Elementary School

Hart Elementary School

Kocurek Elementary School

Langford Elementary School

LBJ High School

Martin Junior High School

O.Henry Middle School

Ortega Elementary School

Overton Elementary School

Pease Elementary School

Summit Elementary School

Webb Middle School

Winn Elementary School

Wooten Elementary School

Size &

Location

  • Size
  • Location
    Austin, TX

Services Provided

  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.

Related Divisions

Other

Educational

Projects

Browse other related projects

Nan Clayton Elementary School

Austin, TX

The Austin Independent School District (AISD) was in dire need of opening a new elementary school to serve the southwest region of Austin, particularly the Circle C area. This area has been served by the Kiker Elementary School since 1991. With the population growth in the region, Kiker had doubled in occupancy through the use of portable classroom buildings and a higher student/teacher ratio. Through the November 2004 Bond election, voters authorized funds to build a new school in this area. AISD scheduled a 40 classroom school opening by August 2006. The selected site was within the Edwards Aquifer Recharge Zone (Barton Springs Zone) and had no road or utilities adjacent to the site. We were responsible for all civil engineering and development permitting for the site and quickly identified that the land plan provided by the architect and AISD would not meet the environmental regulations for impervious cover limits within the Edwards Aquifer. To mitigate this, we worked with the design team in creating a new site plan that was more environmentally sound. Doucet designed the drives, parking, stormwater management and utilities for the site. Our design included a zero-discharge retention/re-irrigation system that met the non-degradation standards of the City of Austin. The irrigation facilities were placed within a native vegetation area with minimal disturbance to the ground. Where necessary, small cedar trees were hand-cut at ground level to provide an area for the irrigation heads to spray. The schedule required a construction groundbreaking by August 1, 2005 for a school opening for following year. Doucet prepared all site development permit application materials, the TCEQ Water Pollution Abatement Plan, construction documents, and permit acquisition. All permits were acquired by August 1st enabling construction to commence on schedule.

Learn More
Educational

San Marcos High School Softball Field

San Marcos, TX

Doucet worked closely with the Architect and school district to select a site for the San Marcos High School softball field. Once selected, we coordinated with subconsultants and prepared construction documents and assisted with the construction bidding and administration. Amenities included restroom, concession, and storage building.

Learn More
Educational

Seguin High School Girls Softball Field

Seguin, TX

Doucet provided engineering services including plans and specs for bidding and construction. Work included design and specifications for grading, earthwork, planting, irrigation and dugouts with slabs to allow for future CMA walls, scoreboard, lighting, power and water and sewer, slabs for press box and bleachers, fencing, and review for compliance with accessibility codes.

Learn More
Educational

St. Edwards University

Austin, TX

Doucet is the on-call engineer for St. Edwards University, providing civil engineering and surveying services for the university since 2014. Currently under construction is the new Residence Hall with a commercial food service space and a new Operations building. The St. Edward's University Residence Hall site is 5.0 acres, and is located within Tract 3 of the overall campus, which is comprised of 4 total tracts at 3001 S. Congress Ave., in the full purpose jurisdiction of the City of Austin. The $40 Million Residence Hall, at 450 beds and 124 units, totals at 185,500 SF and will allow approximately half of the student body to reside on campus. This provides significant housing options to the University as it attracts more out-of-state and international students who often can not afford the rising housing costs in Austin. The site development permit also includes construction of the driveway, parking spaces, grading/drainage, utility, water quality measures and landscape improvements. Construction will be underway in August 2016.

Learn More
Educational

Taylor High School

Taylor, TX

Doucet provided comprehensive civil engineering design, permitting, and construction phase services for this $30 Million new high school for Taylor ISD. The project included 180,000 SF of educational and office space on 50 acres of land at the southeast corner of Highway 79 and FM 973. The project also included the high school parking lot, vehicle driveways and pedestrian access, sport fields and all the utility and drainage infrastructures.

Learn More
Educational

Texas School for the Deaf

Austin, TX

Doucet is serving as design engineer under the project architect for this campus renovation project. The scope includes the prioritization and identification of the school's most urgent issues that includes but is not limited to fire alarm panels, fire suppression systems, reconditioning or replacement of boilers and chillers in TSD's central plant, foundation repairs, security upgrades, campus electrical distribution system repairs, and water and gas line repairs.

Learn More
Educational

What could your business accomplish with Doucet?

Let's Find Out

Your browser is out of date!

We noticed you are currently using an old version of Explorer.
To view this website, we recommend you update your browser.