Educational

Austin Independent School District (AISD)

Doucet provided civil engineering and consulting services for multiple repair and improvement projects at 15 existing campuses for AISD, including more than 30 individual projects under 4 separate contracts. The projects included drainage and grading improvements, sidewalk additions and improvements, accessibility compliance, pavement repairs and restoration, tennis court resurfacing and recreation improvements. Doucet was responsible for visiting the school sites to identify limits and extent of the repair and improvement items, preparing bid documents including construction plans and specs for the improvements, assisting in the bidding process and providing construction phase services. Some of the campuses include but are not limited to:

Anderson High School

Barton Hills Elementary School

Becker Elementary School

Bedicheck Middle School

Boone Elementary School

Bowie High School

Cook Elementary School

Hart Elementary School

Kocurek Elementary School

Langford Elementary School

LBJ High School

Martin Junior High School

O.Henry Middle School

Ortega Elementary School

Overton Elementary School

Pease Elementary School

Summit Elementary School

Webb Middle School

Winn Elementary School

Wooten Elementary School

Size &

Location

  • Size
  • Location
    Austin, TX

Services Provided

  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.

Related Divisions

Other

Educational

Projects

Browse other related projects

Dripping Springs ISD Tennis Complex

Dripping Springs, TX

Doucet provided the conceptual plan and engineering design for a nine-court tennis complex. Work included preparing construction documents and construction administration.

Learn More
Educational

Expansion Project for Andrews Elementary

Austin, TX

This project involved library expansions and administrative office improvements on 8.18 acre site. Doucet was responsible for all civil engineering services to support the design, permitting, and construction phase of the project as it pertained to exterior improvements. Exterior improvements initially just included accessible pathways to building entrances/exits. Due to the Memorial Day 2015 storm event, the gymnasium was flooded. Doucet was tasked to provide design, permitting, and construction phase services for drainage mitigation to the courtyard/gymnasium areas of the campus. Additional drainage issues between building wings C and D, as well as areas to the south of the new library under construction, were identified due to that storm event and subsequent major storm. In addition, the wastewater line serving the school was inspected via camera and was found to be collapsing in several areas. Because the original wastewater line was the Orangeburg pipe installed in the 1950s, Doucet designed a new wastewater line to replace it.

Learn More
Educational

Guerrero Thompson Elementary School

Austin, TX

The Austin Independent School District (AISD) was in need of opening a new elementary school to serve the north central region of Austin to relieve the overcrowding at McBee and Walnut Creek campuses. This site is located at 102 E. Rundberg Lane and sits on approximately 18 acres. After a prolonged site acquisition process, AISD scheduled a 40-classroom school opening by August 2013. Due in part to our efforts on this project, the two-story 98,000 SF school opened on time. Doucet was responsible for all civil engineering and development permitting for the site. Doucet designed the signalized intersection at Rundberg Lane, analyzed and reclaimed portions of the site out of the floodplain to make room for the school improvements, and designed the drives, parking, stormwater management and utilities for the site.

Learn More
Educational

Hays Consolidated ISD Bus Parking

Kyle, TX

Additional parking was required for Hays County ISD bus purchases The overall site had a gently sloping terrain with a drainage area crossing in the middle of the proposed bus parking facility, thereby limiting any usable access to about four acres of the property without the installation of drainage structures. Topographic survey information was needed and required by the City in order to prepare hydraulic modeling of the drainage channel crossing and to obtain a permit for the construction in and adjacent to the drainage area and upstream from ongoing single-family property development. Doucet prepared one set of construction documents for permitting and construction. Doucet also submitted and processed the plans and applications to the City of Kyle and aided the Client in obtaining approval from City of Kyle for their planned improvements.

Learn More
Educational

IDEA Charter School (Rundberg)

Austin, TX

Doucet is engineer for IDEA Charter School at Rundberg, along the IH-35 southbound frontage road. Phase Two includes construction of the primary school building, completion of the ring road and ancillary parking, extension of the ring road north to Brownie Drive, and related drainage and utility improvements. This project also includes approximately 500 City of Austin street improvements to connect Brownie Drive to E. Longspur Blvd.

Learn More
Educational

Jaime D. Padron Elementary School

Austin, TX

Doucet was responsible for a complete renovation and addition to existing industrial buildings in order to create a two-story elementary school in a highly developed area. This 115,967 SF school includes 112 parking spaces. Due to the large amount of apartments in the area, it was anticipated that 75% of the student population would walk or bike to school. To facilitate pedestrian and motor vehicle traffic, a High-Intensity Activated Crosswalk (HAWK) was designed into the project to cross West Rundberg Lane, an arterial road adjacent to the site. We completed all civil engineering and development permitting for the site to include designing a left turn lane on the existing arterial road for access into the site and adjusted internal circulation and existing driveways to create one way traffic flow in and out of the site. We also utilized existing regional water quality and detention facilities to avoid additional on-site stormwater management requirements. In addition, the existing pavement condition was assessed to determine what pavement areas required rehabilitation or replacement.

Learn More
Educational

What could your business accomplish with Doucet?

Let's Find Out

Your browser is out of date!

We noticed you are currently using an old version of Explorer.
To view this website, we recommend you update your browser.