Doucet is serving as design engineer under the project architect for this campus renovation project. The scope includes the prioritization and identification of the school's most urgent issues that includes but is not limited to fire alarm panels, fire suppression systems, reconditioning or replacement of boilers and chillers in TSD's central plant, foundation repairs, security upgrades, campus electrical distribution system repairs, and water and gas line repairs.
The Phase II Improvements consisted of the construction of four (4) new buildings, renovation of seven (7) existing buildings, associated with the utilities, paving, parking and drainage improvements. Doucet upgraded the entire water and wastewater system within the approximately 80 acres campus, added new parking lots and modified existing driveways and circulation drives. The improvements included the construction of approximately 1,400 linear feet of new sidewalk to meet ADA requirements as well as adding a serpentine segmental retaining wall, a bus stop, tree planting, curb / gutter and the associated utility adjustments. Doucet developed construction plans and specification for site grading, storm sewers, sidewalks, driveways, water and wastewater improvements, retrofitted existing drainage problem areas around the campus, and performed construction phase services. Due to the old age of the campus, many underground utilities were not documented. Doucet worked closely with the contractor and school officials and resolved all the utility conflicts. Doucet also obtained approval from the City of Austin and Texas Department of Licensing and Regulation (TDLR) and prepared the Storm Water Pollution Prevention Plan (SWPPP). Special design considerations included construction in a campus setting that has tremendous amount of pedestrian traffic.
The scope of civil and site work consisted of extending a fire water supply line to feed the proposed building sprinkler system being installed with the building renovation. The fire line water source is the University's fire water distribution system, which has an existing 12-inch diameter dedicated fire line along Whitis Avenue and Inner Loop Drive, on the north side of the Peter Flawn Academic Center.
Doucet was engineer for a 5,000 SF library at Winn Elementary and conducted site work including a detention pond, drainage, and grading. An additional sidewalk was added as well as utility service lines extended to the library.