Educational

Texas School for the Deaf, Phase II

The Phase II Improvements consisted of the construction of four (4) new buildings, renovation of seven (7) existing buildings, associated with the utilities, paving, parking and drainage improvements. We upgraded the entire water and wastewater system within the approximately 80 acres campus, added new parking lots and modified existing driveways and circulation drives.

Size &

Location

  • Size
  • Location
    Austin, TX

Services Provided

  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.

Related Divisions

Other

Educational

Projects

Browse other related projects

Campus Additions for Round Rock ISD

Round Rock, TX

Doucet was responsible for designing this campus located on Austin Community College's (ACC) Round Rock location. Doucet developed 10 new portable classroom buildings, along with large walkways for pedestrians, utilities, bus drop-off, accessible routes, and connectivity with surrounding areas. The site/civil plans included designing a pedestrian traffic control plan to safely accommodate ACC students while construction was taking place. This campus is considered a temporary early college facility until a more permanent facility can be planned, budgeted, and constructed. The project was on an extremely tight timeframe as the planning, design, permitting, and construction duration was completed in less than six months.

Learn More
Educational

Dripping Springs ISD Tennis Complex

Dripping Springs, TX

Doucet provided the conceptual plan and engineering design for a nine-court tennis complex. Work included preparing construction documents and construction administration.

Learn More
Educational

Expansion Project for Andrews Elementary

Austin, TX

This project involved library expansions and administrative office improvements on 8.18 acre site. Doucet was responsible for all civil engineering services to support the design, permitting, and construction phase of the project as it pertained to exterior improvements. Exterior improvements initially just included accessible pathways to building entrances/exits. Due to the Memorial Day 2015 storm event, the gymnasium was flooded. Doucet was tasked to provide design, permitting, and construction phase services for drainage mitigation to the courtyard/gymnasium areas of the campus. Additional drainage issues between building wings C and D, as well as areas to the south of the new library under construction, were identified due to that storm event and subsequent major storm. In addition, the wastewater line serving the school was inspected via camera and was found to be collapsing in several areas. Because the original wastewater line was the Orangeburg pipe installed in the 1950s, Doucet designed a new wastewater line to replace it.

Learn More
Educational

Guerrero Thompson Elementary School

Austin, TX

The Austin Independent School District (AISD) was in need of opening a new elementary school to serve the north central region of Austin to relieve the overcrowding at McBee and Walnut Creek campuses. This site is located at 102 E. Rundberg Lane and sits on approximately 18 acres. After a prolonged site acquisition process, AISD scheduled a 40-classroom school opening by August 2013. Due in part to our efforts on this project, the two-story 98,000 SF school opened on time. Doucet was responsible for all civil engineering and development permitting for the site. Doucet designed the signalized intersection at Rundberg Lane, analyzed and reclaimed portions of the site out of the floodplain to make room for the school improvements, and designed the drives, parking, stormwater management and utilities for the site.

Learn More
Educational

Hays Consolidated ISD Bus Parking

Kyle, TX

Additional parking was required for Hays County ISD bus purchases The overall site had a gently sloping terrain with a drainage area crossing in the middle of the proposed bus parking facility, thereby limiting any usable access to about four acres of the property without the installation of drainage structures. Topographic survey information was needed and required by the City in order to prepare hydraulic modeling of the drainage channel crossing and to obtain a permit for the construction in and adjacent to the drainage area and upstream from ongoing single-family property development. Doucet prepared one set of construction documents for permitting and construction. Doucet also submitted and processed the plans and applications to the City of Kyle and aided the Client in obtaining approval from City of Kyle for their planned improvements.

Learn More
Educational

IDEA Charter School (Rundberg)

Austin, TX

Doucet is engineer for IDEA Charter School at Rundberg, along the IH-35 southbound frontage road. Phase Two includes construction of the primary school building, completion of the ring road and ancillary parking, extension of the ring road north to Brownie Drive, and related drainage and utility improvements. This project also includes approximately 500 City of Austin street improvements to connect Brownie Drive to E. Longspur Blvd.

Learn More
Educational

What could your business accomplish with Doucet?

Let's Find Out

Your browser is out of date!

We noticed you are currently using an old version of Explorer.
To view this website, we recommend you update your browser.