Water Resources

Dam Engineering: SC Robertson Dam and DeCordova Dam

SC Robertson Dam (Lake Limestone) and DeCordova Bend Dam (Lake Granbury) Breach Analyses and Inundation Mappings

The Brazos River Authority (BRA) owns, operates and maintains a series of dams along the Brazos River. The dams have high-hazard classifications because of the consequences of dam failures, and because their sizes and hazard ratings are subject to State Dam Safety criteria. One of the dam safety criteria is that high-hazard dams must have written Emergency Action Plans with detailed supplemental breach inundation mappings. The BRA hired a preeminent hydrologic & hydraulic engineering firm to prepare the complicated breach analyses (using HEC-RAS hydraulic modeling) and detailed breach flood inundation mappings for S.C. Robertson Dam (Lake Limestone) and DeCordova Bend Dam (Lake Granbury) for “sunny-day” breach failure conditions and for Probable Maximum Flood (PMF) design flood conditions.

S.C. Robertson Dam has a 8,130 foot-long embankment section with a maximum fill height of 60 feet, a concrete gravity spillway with 5 radial gates and a stilling basin. DeCordova Bend Dam has a 1,400 foot-long compacted fill embankment section with a maximum fill height of 63 feet, a concrete Ambursen-type spillway with 16 radial gates and a stilling basin. Breach analyses and breach flood inundation mappings were performed using HEC-RAS hydraulic program.

Our firm calculated the breach parameters for both dams, the embankment sections, the gated spillway sections, the “sunny-day,” and for PMF design flood hydraulic conditions. We performed data research of the configurations of the two dams, including reviews of the construction as-built drawings and performed site visits to confirm field conditions and to confirm the locations and types of reasonable breach scenarios.

Size &

Location

  • Size
  • Location
    Thornton, TX and Granbury, TX

Services Provided

  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.
  • This is some text inside of a div block.

Related Divisions

Other

Water Resources

Projects

Browse other related projects

Water Quality: West Bouldin Creek Site 97 Water Quality Pond

Austin, TX

Identified as public land (approx 16 acres) within the West Bouldin Creek watershed, Doucet provided water quality, erosion control, and low storm intensity flood control to the creek and riparian corridor. The Best Management Practices (BMP) consisted of a channel runoff diversion structure, a sedimentation/extended detention pond, and a downstream level spreader with a ½-acre vegetative filter strip prior to discharging flow back into West Bouldin Creek

Learn More
Water Resources

Water Quality: Zilker Park Landfill Drainage Improvements

Austin, TX

Working with the Parks and Recreation Department, Doucet provided engineering services for a previous landfill site bounded by Town Lake to the north, Mopac Expressway to the east, Stratford Drive to the south, and Eanes Creek to the west. Doucet performed the following: Hydrologic & Hydraulic Analysis for the contributing drainage area upstream of the project site Channel Improvements Design to convey runoff using 6” Conlock with vegetation infill and covered with biodegradable soil retention blankets Liner System Design using Geomembrane EPDM Rubber Liner for the new channel Bank Stabilization development using vegetated reinforced soils, vegetation planting, soil retention blanket, rock riprap, limestone blocks and AKWARDRAIN for Eanes Creek.

Learn More
Water Resources

What could your business accomplish with Doucet?

Let's Find Out

Your browser is out of date!

We noticed you are currently using an old version of Explorer.
To view this website, we recommend you update your browser.