Doucet provided planning and civil engineering services for this state-of-the-art rehabilitation and health care center (125 beds) located on a 10.42-acre site on the Edwards Aquifer Recharge Zone in Southwest Austin. Doucet represented the Client at neighborhood and City meetings and prepared a zoning application and supporting materials to get the property re-zoned. After the zoning approval, Doucet worked closely with the Architect, Landscape Architect and other sub-consultants to prepare and process a conditional use consolidated site plan, a floodplain study and a Storm Water Pollution Prevention Plan through the City of Austin. Doucet used an innovative water quality system that combined a sedimentation/filtration pond with a vegetative filter strip so that stormwater received an additional measure of treatment on this low impact site in a sensitive environmental area. A Water Pollution Abatement Plan from TCEQ was obtained. Doucet was successful in getting City approval and provided construction phase services where required and requested by City and Client.
Doucet was engineer for a 5,000 SF library at Winn Elementary and conducted site work including a detention pond, drainage, and grading. An additional sidewalk was added as well as utility service lines extended to the library.